Rookie will learn of 200 common sense of the history of home decoration tips:
1, shoe racks, the partition must not do, stay a little space so that the shoes of ash can leak into the ground, water and gas stove top mounted lamp. Fixed the toilet floor drainer position must first think good, measured dimensions. Floor drain's best located in brick, if in the middle of brick, regardless of how skewed, floor drain tiles will be low.
2, bathroom, air conditioning outlets are not design switch. Especially the bathroom heater, to a two-stage switch with a plug. If you want to close to electric, pull the plug at risk
3. about brick Yang Kok part of treatment methods in the final analysis, is at the level of the workers. If the water level is good for workers, the workers and grinding of ceramic tile tools better, they should not hesitate to choose wear a 45 degree angle. In effect, as long as the mill, grinding and 45-degree angle of Yang Kok practices, is the most beautiful! if workers do not level, then you should select use Yang Kok article, because the mill's not good to 45 degree angle practices than article with Yang Kok.
4, good water pressure test after the water is also very important. Test, all will be present, and the test of time at least 30 minutes, the best conditions permit, for an hour. 10 kg pressure and, finally, there is no reduction may test passed.
5. When must sugangmen okay sugangmen door frame dimensions of the projection walls, inform the installer, making the final door frame and paste up tiles wall is flat, so that both beautiful and easy to do.
6, woodworking package door set and brick of tiles is to tie, package door sets, consider the following ground (ground on both sides of the door of any side) do you want to tile or other cement mortar levelling because Mun Kit if you paste porcelain, always before the nail to the ground, the future package with cement, cement and door set if it touches, it causes the door set wood absorbent mouldy
Below 7, mattresses and Slatted bed bases must be air. Bed bases generally uses the best Chinese FIR Board
8, do paint as much paper adhesive tape
9. buy lamps to note: in General, as far as possible selection of glass, stainless steel, copper or wooden (shelf), generally don't buy iron above what other plating coating Ah, Ah, what paint, easily fade.
As far as possible with 10, washbasin Bowl, glass ceramic pots difficult health
11. modification to your own projects hydroelectric power, and ask them to follow the line to open the CAO. They watch their lines to draw the line as wide open and Cao. Each to their own acceptance.
12, water must be done well, be sure to test water!
13, many construction verbal agreement became the checkout was slaughtered gaps, be sure to write in black and white, changes of the project must ask the price, write!
14, ground floor, surface installed if it is to make cement layer back effacement.
15, the kitchen door, or do you want to do the decoration carpentry of wood doors for good dropper. 16, room packed as much as possible.
17, toilet shower partition you want to do outside the or. Cannot map easy-a shower curtain, actually very inconvenient, the water flow in Montreal.
18, do a door of materials to selected wood grain and detailed material.
19, before installing cabinets must confirm your home water is OK.
20, kitchen and bathroom floor tiles necessarily don't pick white.
21, ceiling to pay particular attention to the effacement Putty to put duoleshi 22, living room lights lamp number should not be too much for a good, simple, like a lamp shop!
23, buy those things need to be installed as far as possible, request the installation of the goods sold, is not a package installed, you must adhere to the pay only after you have installed the full paragraph!!
24, decoration, put your previously collected factory merchants carry a business card
25, aluminum plates of protective film is best removed prior to installation.
26, Shoe cabinet, it is best to use blinds Gates foul-proof. Shoe cabinet edges can stay in a outlet to plug in the drying shoes.
27, cutting food can be a little light.
28, convenient restaurant or an exhaust fan, so eat hotpot or barbecue without dirty room housing the ceiling.
The gate of the best arrangements for 29, a junk Cabinet, can be placed on top of the shoe. The usual things such as umbrellas, bags, scissors, small change, often eaten the medicine and so on in there, so it is very convenient.
30, there is no need for expensive smallpox, if not too worried about the damp and smoke problem, it is recommended to use a moisture resistant gypsum board with brush waterproofing paint, my house is a guest toilet, pretty much. If you must use aluminium buckle ceiling, it is recommended that:
1, not too expensive.
2, use the net colors, especially the kitchen ceiling, pure white is very good, color white unless and decoration style match, otherwise easily.
3. grasp the idea yourself, don't trust sale of smallpox, they look really really soil.
4, staring at the scene, the edge is important, don't let them slip, or else leave black sewing, how do you see how ugly.
31, third day is perforated and continue sticking tiles, cooker hoods and water heater vent to advance to play good, if you paste porcelain, then punch, it is not easy. Therefore, in the decoration must be selected, range hood, stove, water heater, etc, to determine the size of the hole.
32, taking into account the order of the Cabinet while pretty, but not durable, combines online some classmates views and experience, the Cabinet adopted a framework of cement do, both inside and outside the two stick tiles, floor tiles, marble countertop and door or selection of wood. Do it out of the closet durable, moisture-proof. And spending. Many neighbours saw all that well, this is not my blow.
33, after doing a door sets, slurry workers began installing gypsum lines, walls batch
Ash project. My family was relatively flat wall surface, number 2-3 road. When the batch is granted ash once ash polished once and then brush primer, paint finish and Polish, final coating with ICI brush twice, the entire wall surface looks smooth and flat, really good. Wall/ceiling completion, Carpenter master start doing wardrobe. The wardrobe is the great brand 18cm emission do outside and then put facings, although there is no furniture store so good-looking, but durable, quality should be better than buy. I stood in the Cabinet of the Board are not afraid. Buy I'm afraid. The backplane is relatively thick, buy is very thin.34, other students in the tile must note the following:
① the best they can in the scene.
② some not-so-perfect tile can let workers posted in the future, some do not see a location, such as cabinets, tables, mirrors, also note tiles, bricks, and so do not be waist workers attached to the location above, otherwise you will not see anything, also wasting money.
③ wall tiles, floor tiles in the patch before water time must be enough.
④ necessarily something you want to use the floor drain plug, and prevent the blockage of cement it off. My family floor drain because of blocked off the cement, spent 30 door looking for management service, make up a lot of dredging mud block.
⑤ people on-site, workers will not be too wasteful of ceramic tiles. When my family tiles is not in the scene, then went to look at, wasted a lot of brick, heartache, sweat rice noodles.
35, a wall of long, tall. If there is a bathroom wall, four on each side walls are rate out of its long, high. And then after deduction of an area of the Windows and doors. The final calculation of the ground area. You put the size of a good, or you can take to sell tile shop, they will help you to meet. Plus 5 percent of the loss.
36, bedroom ceiling preferably double control, door a, a bed, save big winter lying in bed and then up the lights.
37, socket location must be good, height, spacing. I first met playing cassette position is reinforced, put the cassette found just be TV, microwave oven, a desk, stop, the first two furniture location moved higher, finally discovered not only highly incompatible with engineering, also not a good fit with stainless steel leg, custom-made aluminium feet only.
38, just around the corner in the hallway with a light various loading, i.e. bright and effects.
39, mounted lights didn't consider dining table placement, now in the middle of the table lamp.
40, bathroom tiles do not use too much pigment, one is easy to clean, long time too dull!
41, sockets to pack, furniture to buy out of the ground to consider security to be resistant to dirt,-like room to read more, should adhere to the principles.
42, aluminium plates are not necessary to buy a high price, very cheap aluminum buckle is much better than PVC effect, then spend more money or do not see the effect of significantly different. Buy aluminum buckle paying particular attention to the joist instead of aluminium plates itself (aluminum buckle target is too big not easy checkers), keel tends to end the demons.
43, the color of the floor tiles are hard to find satisfactory, I did not find, but the two are not satisfied with the color staggered parquet then a 45 degree angle is able to reach me very satisfied with the results. This is bricklayers themselves to good advice.
Top 44, on the balcony at the back of the cupboard, Cabinet, plus a layer of foam board insulation waterproofing effect is very good. The balcony door's fire Board not Variant. Balcony of environmental comparison difficult.
45, wood line if there is no suitable may wish to make to order, made to order quality seemed better than samples also. And make more personalized.
46, bathroom cabinet with stainless steel foot belongs to profiteering, find some place to buy shop back crazy cheap price.
47, installation lock to lock tongue some wax, crashed onto wax is late. If there is no door suck so we need to pay attention to prevent hand wall and damaged.
48, Paco floor is very good, I like it, only to be reminded of is directed to the boss about price than a salesperson about the price and better.
49, matte paint is better than highlights beautiful 50, if you then will choose the product decoration PuTTY without talcum powder. 51, install Protector and air switch of junction of works not to province, but not to put indoor outdoor, thought province wages will just outside old junction, electrician recommendations on Indoor swap new, now found him this recommendation is of great value.
52, protector and air switch to use the brand name. I used the "Merlin". Want to buy genuine goods also simple, direct telephone enquiries, Merlin Gerin, Headquarters telephone number, and then beat in the past asked local branch number.
53, than the stage the audience trough, pretty, delicate Bowl well cleaned. Basin mixer with the audience to pay attention, taking into account the thickness of the pelvic edge, leading to longer beak.
54, wall corner without making any modification and very pretty, but prior to find painter's stage and painters made clear to the corner-line help-the top corners to do straight line.
55, online slot cement PuTTY surface group is important prior to surface treatment, for not sturdy surface with a clean ball handling is appropriate.
56, plaster suited to complement the wall large tunnel, of course, if the tunnel is too large or need to use cement.
57, frosted glass back must protect don't wash paint, it is difficult to clean!
58, vegetable basin mixer must be with the back of the switch, it must use the finger is not easy to keep clean hands has time to turn up oil is difficult.
59, Deluxe automatic drying rack price comparison of water is too big, and found some famous brands in the design of structure, rather than a first-line brand, the price is much lower.
60, you can consider using an in-ground metal socket, the socket is expensive and more than 100, but very convenient, flush with the ground, the feet hit the outlet pops up. Suitable for large living room. Or on food
Hall, dining table, used to plug in the pot (prevent hang fixed when walking up and down the wires)61, storage room. Already have TX said, but I didn't do doors, looks not very beautiful, and drop clothes closet and easy dirty.
62, beds starting frame (called a?). I am a professional bed company bought fabric bed and spent $ 350 so something, the bed is a hand a la, bed bases will upset, exposing the underlying storage space, wonderful!
63, not practical double-bar Towel rack! now and SOAP uses the same, Basic does to layer on Festoon drying towel
64, think inside the trash can not enough cupboard utility, on the outside. There are never mounted door plate of trash and table dustbin, summer open door would be a bad one. Trash or out good.
65, table fine small cabinets, you can place some stuff, very convenient.
66, that in my opinion, MOP buckets in performance requirements is not high enough to own a masonry, paved and the surrounding environment to match the tiles or mosaic that is beautiful, and money.
67, bathrooms a check point can nail nails used to hang something.
68, bathroom design a small cupboard on clothes, no longer have to worry about bathing forgot clean clothes.
69, washing machine with dry serious impractical, with the exception of one year only yellow by day, and the evil giant. Thick clothes, towels or baking, let the Sun Xiao disinfection. I have an overdraft, you need to save points money.
70, even in the laundry room, a laundry and pool to hand wash something. Originally thought that use fewer, so buy a very cheap Teresa mixer. I didn't expect this laundry pool is really easy, as I use most frequently a washing area. What rag, socks, towel, Ah, were all in it, even washing hands are also there.
71, mounted lamp belt really do not practical, decoration finished until now haven't met. Have guests only SHOW about spotlight, I myself simply forget also installed a this thing. When the original is open PARTY, now under the romantic open Spotlight opportunities are multiple.
72, the greatest experience is in fact the simpler the better the fitting, less pollution, less and less attention.
73, useful stuff:
① design reasonable storage room.
② North terrace available to wash the dirt of the sink. Difference and bathroom washbasin and washing dishes in the kitchen and washing-up water bucket.
③ the bathroom you can pull out leading head. (Never in basin wash TX exception).
④ easy to clean the floor and suitable cleaning tool.
⑤ kitchen countertop work lamp.
74, buy toilet must be measured their hole distance, not bought to return that's ...
75, kitchen floor tile paste didn't do best after weigh before, at the lowest level is not a floor drain, to not do before and the renovation team pointing, die many cells.
76, window sill with a wall of stone Pearl, Angeles is a 800X800 of tiles. Manufacturers cut grinding, brick veneer. Radiation pattern pretty yet.
77, toilet shower room must size large enough, and you want to use the transparent glass, so there is less cramped bath promotes.
78, tiles jointing does not check the use of white cement. Not a month becomes black, ugly death. As a result their bought goufeng own hook, the tired
79, cabinets of artificial stone should pad is the result after wood, found no installed, now can't cut meat above, promised me retro almost two months have not yet installed (only to Polish a).
80, confused and don't trust designers. Of course, can be visited several decoration companies, from every design extract really useful thing, the key is that you want to put the House dressed.
81. If the leak the original developers have already installed the nuisance odor "bowl", don't get it out.
82, the bathroom floor tiles paste after touching, if running slow rework immediately. My family's water slowly, then melted, now it is always a bit of the bath water, our main toilet a few hundred silver shower are idle, now total racing what remedy.
83, mounted washbasins is to consider and mirror, put your teeth Cup shelf, towel Rack's relative position.
84, consider buying the mirror mirror lamp location, if you temporarily do not want to install front lamp, mirror's size is to be screened to front lamp pre-drilled best.
85, on the balcony, washing machine for a small cabinets, conveniently placed a few odds and ends, such as washing powder within the debris. Both good-looking and practical 86, must be at the upstairs do waterproof ... or upstairs, dripping down a countertop, walls of a mess ... 87, do not blindly follow online buying, I later discovered that some owner doesn't allow himself to be smaller than the group purchase also cheap.
88, TV background wall must impose a few Sockets, TV, DVD ... a pendulum, you will find the socket is not enough.
89, changed water before going to consider future installed shower of detail drawing, for example, is the left or right basin, basin water and drainage of the set. Otherwise, changing for the better after the discovery phase of the washbasin is hold!
90, curtains, you'd better get the size of their stay, the boss shows less dimensions. If less, what what. Or they look at his discretion.
91, decoration of the construction process:
(1) the venue, the demolition of walls, masonry wall.
(2), bathroom, kitchen floor do 24 hours closed water test (requires developers to accomplish this task).
(3) trunking, hydropower reform chisel and acceptance.
(4) letter of buried wire concealment hydropower
Reconstruction project, the closed water experiments no leakage began to make waterproof project.(5) toilet, kitchen with wall magnet.
(6) the venue, suspended ceilings for woodworking, gypsum corners.
(7) packages, Windows set of doors. Production of wooden cabinet frame. (8) the production of wooden doors, synchronization design door and press.
(9) dust-proof paint brush wooden panel (boiled oils).
(10) the windowsill laying marble tiles.
(11) wood panel paste, fine lines produced and installed.
(12) the wall base, polishing, leveling.
(13) with his tools, door seams paste adhesive (protection).
(14) minimum wall oil ICI three times.
(15) furniture paint approach, patchwork, paint.
(16) in the corner, the laying of ceramic tiles, wood or composite wood flooring, waterproof marble bar, kicking foot cord.
(17) lighting, sanitary ware, handle, lock installation debugging.
(18) clean sanitation, sews, removing tiles.
(19) decoration companies internal preliminary acceptance.
(20) third party booking time formal acceptance, delivery of the owners.
92, flue valve mounted back before, be sure to wipe clean, guarantee the valve plate can switch freely and be open to the maximum, otherwise it will affect the effectiveness of smoke extraction hood. You can install when you stay two suspended ceiling is not installed, install the hood and the trial after the ceiling installed.
93, in the living room and dining room so much space, ceiling could do not to do.
94, alignment is to the good air conditioning, power closer to the air conditioning as possible, so that when you see the a/c a power cord, leaving a trace.
95, personally measure and record the housing available in various dimensions, dimension cloaked brochure structure chart, and then on again lead the dimensions of the callout, and ultimately will directly affect the decoration and furniture purchase.
96, lines not good small if selected black walnut is not always enough air, which needs to have a choice, or yield to actual or dedicated his idea, of course, the best both
97, start looking for decoration. Personal experience is concerned, if not a particularly great huxing and intend to simple decoration, seems to find more cost-efficient. guerrilla It is best to introduce, after someone put yourself to go see and agree that special feeling of the owner of the decoration is important, what level of responsibility and enjoy, the former more critical, because if only the Lite, in fact, those who live almost in the city blends on the outside, but the quality is good or bad depending on the sense of responsibility may be.
98, major furniture such as sofas, dining table and Chair, wardrobe, cupboard, and so it is best to also look ahead, to go on too tired, you can find a few shopping environment good around the large Plaza, the underlying trends are seen, so then you have to do is in accordance with their own preconceived style slowly filters out the right thing. Some people on style master better, others on color accurate grasp of, anyway there is time to consider, if you wait for the decoration of the outlet, upcoming events and to see the steps will inevitably end up furniture reluctantly accepted but not very much.
99, to have good furniture'd size down, and then to the room furnishings virtual future.
100, purchase something necessary documents, be sure to save it for later possible refund, replacement, absolutely useful. Especially some of the important items in shopping, brochures, etc., because many things are a warranty, the voucher will be lost.
101, changes in construction projects must ask the price, and then write it out in black and white.
102, check the necessary construction of protective measures, such as entrance doors to EPE paving, and good sill and floor are properly protected.
103, as much as possible the communication with the construction personnel to determine whether he is aware of your intentions. Put yourself respect every master's work, respect for him, so that people feel the importance of the work to be more responsible? saying no is called "says Shiao:"? (but if you are faced with a cunning take advantage of you of the fact, that is a tooth for a tooth, assertive) in particular to some edge engineering is the need of several types of support, the responsible workers be coordinated better carry out their duties, or else we are back and forth tipiqiu buck. Like my brick to help me solve some carpenters and electricians also solves some problems of the brick. Because each teacher's experience is different, as long as he is willing to help you.
104, it is best not to make furniture, because this might have some layout can no longer change. If you do not want to have to hold the quality, endless trouble.
105, changed water pipes must be careful, one is costly, if not suspended ceiling must go from under the floor, in the event of mains water out of the problem is big trouble.
106, according to own actual need to arrange the wiring so that you don't waste (especially cloth many lights and spotlights doesn't seem useful, must also avoid inline, waste electricity), but some parts of the province cannot, for example the bathroom mirror, to regular air duct and Shaver; and if shoe inside or following a socket is also good, you can use the baking shoes, I really regretted not cloth this thread.
107, the bathroom to dry wet partition, if the area is small with a columned just fine (glass basin-Hin dirty, lazy with caution); conditional sets a waterproofing of the best small cabinet admitted sundries, anything put out there for sure does not look good.
108, wood brush smooth white paint is polyester good than Nitro (this is listening experience of the painter road talk).
109, cabinets must carefully to compare several quality, do solid sturdy enough, because this item now has several thousand oceans and also on the stove, sink, etc.
So I'd rather let things on the cheap. But it is best not to do inside the Cabinet table or trash; also if funds are limited, basket, baskets, m barrel flavour of what all you can do, these parts in the closet company generally sell very expensive.110, wardrobe more not less, Ning, Ning do small, women remember! hanging space to be able to put down the longest blouse.
111, glass or mirrors not good handling things best buy in the vicinity, or you should think which means of transport.
112, curtains preferably furniture home appliances full entry and then made to match the overall style tone. But before you can track cleaning up.
113, gas to pipe the best done before the tiles, or likely to damage the walls. It is best to let the gas companies draw a graph or a sign on the wall, because the kitchen company required depending on the requirements in the Cabinet counter any body hole.
114, kitchen cabinet setup time is longer, less then 4 ~ 5 hours to more than 2 days, to be prepared. Install time to check whether the used material is that you provide (through hinge holes can be seen cabinets materials). Kitchen cabinet installation, clean up the kitchen, because cabinet once installed, the corners are not able to be cleaned.
115, furniture installation best alongside watched, especially as the wardrobe of laminates are several holes chosen, I was not watching, as a result, the distance between the plates too small to hang clothes stretching does not open, later adjustment.
116, considering that formaldehyde pollution, can be placed in the room, and other green plants, diaolan furniture of door open all odour, or you can buy a special something to eliminate odours.
117, installation of gas detectors, booking gas ignition.
118, brush Wood coatings: best shop finished floor tiles such as room or wood floor and then brush. If you must brush, it's best to clean up the room. No tile or wood floor room, the room a lot of dust, then brush Wood coatings, dust easily attached to the brushed wood lacquer wood surface, feels there are thorns pricking feeling, although you can use the higher grade sandpaper, then brush once resolved, but the last brush out feels's feel and the overall effect is a little play button. Room finished floor tiles and tile brush, then the air of dust content less than many shop front, Basic does not appear flashed over wood lacquer wood products after the dust is attached to the surface. Is so, because small Wu decoration encounter this situation, I decided to buy HI plus wood-paint before it brush out effect, feel very smooth, it feels as if I am home in Ho Lee wooden doors. Only because of the above, the result was a lot of discounts in effect, this has always been a matter of regret that Xiao Wu. And I'm in organizations-Hi plus paint group purchase, there are students home. So here remind students to watch out for. I wonder if other wood lacquer is the case, but in accordance with the principle of provable, so here remind students to watch out for.
119, on the complement paint: paint ' pay is, wall dry and then batch up PuTTY, PuTTY layer dry brushed after. After you finish paint brush if no reason is mounted lamps and electrical switches. Please, remind mounted lamps and electrical switches of teacher pay attention to it, before the hands are clean, so loading sin when he does not dirty walls. Also, a refinishing process. Of course, dirtying up the walls, the renovation team for sure is to get the paint ' pay to refinishing, that is, dirty walls clean (if it is a paint company, they will let the teacher pay to repair paint, if you notice a lot paint ' pay after you finish the brush will remain part of the wall paint, paint for the remaining part is used to supplement paint). Just a note here, do not let the teachers pay charge lamp dirtying up the walls, you can let the paint ' pay less ran a trip (at least half a day), we own it convenient, why? sometimes, and convenient, and is convenient. Generally speaking, lacquer in the brush before you finish the wood-paint brush, doing so was to avoid Wood coatings in the stem of the brushing lacquer walls. Of course, in actual operation, shop floor tiles can also be finished (tile was previously granted good wall PuTTY) and then brush wood lacquer, wood coatings dry after brushing lacquer, just do this, of course, affect duration. If you fear the impact duration, to the effect of dust in air is reduced to a minimum, that is going to be lazy point more tidy rooms of hygiene.
120, decoration team choice: as to guerrillas or first optional formal company, I think it is not important, the key is to give you the head of the construction team is responsible for the decoration of the skills of the workers, of course, the decoration of quality and price.
First, find the decoration company should not exceed four, for most, this is the case, if your time is very rich, then the other. And decoration companies on this front, be sure to clear you have to do the decoration project, you can first call decoration companies reported all project, comparing prices and integrated into the various factors taken into account and then you decide which items to outsourcing, which items do you want to a decoration.
On the decoration, decoration offer lower is better, of course, a decoration of the contrary. Sometimes, remodeling to pull business, will some quote under relatively low, as a result, the quality of the works and the quality of the materials used is more difficult to maintain. Decoration of so many items that you want to entry are low, it is not realistic. And decoration of the quote, not only digital, but also inside the content, this project uses materials, specifications, brand, etc. You know, the decoration of each quotation, are actually very high.
121, construction? since I was not eager to stay, so plan to find casual: neighbors home builders, please good may become I identify objects: a brick, a Carpenter, a water electricians, a painter. Design step by step by step, I believe that slow work out right.
122, take every penny spent on the blade: see decoration material, will look at the flowers, good stuff is too much, and it seems every single
Look, economically affordable. Can a short time to put these things once the acquisition is in place, the pressure is really on the economy. Often most people have at this time, the results are presented a final budget overruns, the second is to buy price and quality, then buy the ragged.My view is:
1. fixed price, after the selected material.
Outside the intended price 10 percent of material goods, do not waste time on it. Businessmen always fine too. I'm doing a detailed list of required materials, in a future post will stick out for reference.
Second, can save the province, the flowers flowers.
The most expensive places to live, kitchen cabinet carpentry.
The most easily has the quality problem is water-proof, kitchen and bathroom.
123, do some higher than the cost of furniture buy furniture. General furniture of 500-700 per square meter.
124, concealed engineering is the most important place cannot save money: such as hydro road reconstruction, water repellent treatment.
Approach is requested Interbrew, Interbrew will now have a single decoration services such as water and electricity transformation, materials themselves, $ 40 per metre waterway, $ 20 per metre circuit, half a year warranty. In the first floor on the East side of Interbrew has detailed individual services and pricing announced, we can make a convenient reference 125, most of the way is to use online resources for the collection, retention, the finishing of consolidation, will send on.
126, to save time, increase efficiency, each time on the decoration material market, there is harvest, a detailed practical procurement and budget planning table is very important.
Plan the list is sorted by room category procurement easier to implement: each time to take to the streets to see the same things the indoor, comparability of and effectiveness of the comprehensive, easily.
The second one, hallway, living room, engineering works, restaurant 4 master engineering v. kids room project six, seven, main library, engineering works 8, passenger and Wei Wei works 9, kitchen 10. terrace project 11, Yin desk project would like to put my own plans for the prototypes were listed as follows, posted for reference: the data in the table as an example.
This list makes it easier for procurement plan, may be appropriate before construction project by job reclassification merge, into brick, wood, water, electricity, painting tab again. You can also add the table to the right of the "construction requirement" column. If (wall latex paint three batches three brushes; shoe with great plate, brush polyurethane varnish), etc.
127, home theater rear speakers that sound cable to the embedded in the living room, this is very important!
128, balcony, a hand-washing, renovation water pipe to be embedded. Balcony-washing tank is very important, flowers, hands, etc.
129, toilets, kitchen require background music, the decoration of the former embedded audio and audio cables.
130, be sure to stay on the terrace, the new year on both sides of the socket when hanging lantern, good power. 131, at the entrance of the light switch, it is recommended that you use the induction type. Black day home, save in the dark.
132, foundation engineering construction instructions 1, water, electricity transformation (a) construction team arena the construction must be carried out on the water "Suppression" test (playing "10 kg pressure 15 minutes test", as "pressure gauge pointer" no change, you can rest assured to water pipe, while not spending into tubes, you must first notify the "management", "Administration" for maintenance treatment, "Suppression" normal before conversion. ) And "circuit" test (equipped with a "socket bulbs", "light bulb")
(B) play Groove cannot damage the load-bearing walls and ground cast parts, you can knock down the plaster layer, bearing on the need to install the "box", not undermine the internal surface of the steel structure.
(C) in the "submerged" line pipe before doing the "Groove" "termite", "line" and the "pipeline" in connection with the "direct" or "elbow" connection, "line" and "base case" junction "Cup card you want to install," and all the walls and ground circuit must become a 90 degree angle. If the line required changes, and you cannot use the "direct" or "elbow" of the connection, you need to use the "yellow wax tube", and "yellow wax tube" into the ends of the line tube not less than 10 cm.
(D) circuit having buried into the best use of line-of-pipe "three minutes", is available on ceiling alignment "4 minute line tube". "Pipeline" in the "wire" shall be "joint," and "connectors" to be in a "box", and "found in the tube wire" exceed "diameter" 60 percent.
(E) strong electric "FireWire" with "red", "zero" with "black", "ground" with "yellow
Color "or" yellow separations ";" line "with the" four-core lines ";" the wire "and" audio "and" TV "need to be equipped according to the actual situation.(F) "water, renovation is complete, the circuit" the sea again suppress test, suppress normal cement mortar for seal groove.
133, waterproof (a) of "kitchen and toilet water, electricity transformation" finished letter slots, you can proceed to next step "waterproof".
(B) "waterproof" according to different materials have different construction methods, "Shanghai huili 911" as an example: the bathroom is the best waterproof do top, kitchen waterproof 1 m in height can be done in General, ground water and 30 cm from the wall doing twice, 30 cm above you can do it again, door sets Department waterproof wrap door you want.
(C) waterproof finish to be dry after the "certificate of water" test, time is 48 hours, 48 hours to the next room, such as smallpox no wet marks, you can, otherwise you need to redo the waterproofing layer. Most likely to leak is to "leak".
134, tile (a) owners when choosing ceramic tiles for ceramic tile quality found that their approach: first look at its color and luster is evenly, no noise and small black spots in the row; secondly to see its size is the amount of the standard, measuring tape length and width of the tile, the dimensions to measure its trademark factory dimensions, and then in the ceramic tile of diagonal lines, such as diagonal size, then the tile is positive, then you want to see the flatness of the tile, the most simple and effective method is the same brand of two piece of ceramic tiles and overlap, such as overlapping between two tiles after apparent gaps or you can rotate, the uneven tiles; and finally to see the tiles have no color difference, check out a few methods are the same tile samples, in the light, if no color difference, you can order.
(B) pastes the tile does not have the whole brick empty drum (partial hollow piece cannot exceed 20 percent of brick), where the whole brick hollowing of requires rework, the normal circumstances, each with 100 pieces of tile, wall tile allows one piece of brick is hollowing, floor tile allows 2 tablets brick is empty drum, but you must rework, rework main Member (already included in the loss) by the owners, if more than this range, the main materials of the party responsible for the construction.
(C) ordinary cases, the level of floor tiles 2 mm are allowed, floor tile gap errors shall be consistent, bricks and tiles diagonally should temper (allowed 0.5 mm error), kitchen and bathroom wall tile in addition to the brick and tile diagonally should temper, but also required level degree (allow 1 mm error) and vertical (allow 2 mm error) you want to achieve, bathroom, balcony floor tile, regardless of the floor drain, turn on the right slope, if there is no special reason not filled with water.
(D) in the wall and floor tile shop finished with "filling agent" or "white cement" wet paste fillers.
135, termite (a) 's off the wall and trunking garbage clean-up after a complete termite (that is, the whole house spraying termite medicine)
(B) all sheets after approaching required termite treatment (specifically on the plank class do termite)
(C) laying flooring before on the wooden floor to shop floor a termite treatment (d) injection drug to spray wet termites is better (you can clearly see the moist)
136, calculator is included into the calculator now has set a decimal multiple of the function, operation, you will have different standards, so we need to bring a calculator, now cell phone also has a computing power, but the function is not necessarily good.
137, own prepared two good neutral glass sealant (1 transparent, 1 white), it is recommended that the United States generic company, Interbrew has a sale, 49. The bath room, toilets, kitchen cabinet, door is. Although the generic manufacturers package installation will bring glass plastic, but they provide most of the quality of glass glue is not good, easy to change color or moldy.
138, if not the last resort, toilet not shifter. This stuff can easily plug into the toilet.
139, kitchen of aluminum plates, hood above the two, open hole must wait after hood fully installed then pitched up. My family's early on, then install fume is also down, removal of disassembly and Assembly, are workers get changed shape, seamless smallpox smallpox has become a joint.
140, if in order to unify the appearance, kitchen and bathroom are also mounted wooden doors, that in the loaded after coming to the door frame and ground joint place on glass glue. My home is not timely processing, workers accidentally with water, a lot of water is spilled onto the ground permeability to frame, the following section is a little black (mould).
141, balcony must shop tiles! jingyang Mesa point in a circle to shop, living terrace to shop and railings with high. My home jingyang Mesa corners and no living terrace wall, had to shop for a barrel of exterior wall paint, their periodic refresh ...
142, in hydropower reform seal wall must let decoration master provides detailed hydropower figure.
143, if you are going to put the walls painted in color and in electricity transformation will take into account the problems of change line. I read a lot of lines, air-conditioning outlet-all changed. But in order to save money, not for the entire line, and wiring. This connection must be mounted anywhere for future maintenance of the Whiteboard. And later color wall paint brush out only to find these Whiteboard has more glare, regret Ah ~ ~ ~ ~ ~ 144, this is my lowest-level errors committed, I took it for granted that 1.5 m width of bed is 1.5 m, forget there are also thick bed
Degrees. Also very accurately at the bedside Cabinet rear wall remain good table lamp socket. The result is that the socket was blocked no way to use.145, started before you let the captain of wall decoration on how to deal with, whether the original powder full scoop away. In particular, prepare wall engineering outsourcing to paint company classmates. My family is to paint company, etc, wood finishes ware to know the original wall ash too poor, preferably whole scoop off the back lot of ash. But thanks to woodworking has been done to shovel out original ash bad actions. Finally had to face brush a layer of glue for batch ash 108.
146, increase line sure to rewiring. But from the nearest terminal branch wiring. Not allowed in the original wire plus connector wiring.
147, air-conditioning control switching power supply-side only. Online is not allowed.
148, changes to the telephone and network line location, you can put the original cloth line taken out to continue. But if there are many construction will inappropriately. So the best is the weak current trunk line.
149, measuring circuit reconstruction work, normally be three different wiring methods, respectively.
(1) dozen Groove tube (by Groove length measurement, if a tank has more canals, according to the number of the half pipe. The other half in overhead lines).
(2) overhead lines (not only wear hose tank), the length of the tube.
(3) swap line, press the number even if the number of replaced (replaced line tells the construction team don't throw it out).
(4) light current transformation, as the first method calculation. The difference is to pay attention to the power line was purchased by the who. Owners bought the price to be deducted from the wire.
150, toilet how fixed to the ground, hitting screws? is there convergence of base and pipeline, buying and what seal outside are better: toilet is fixed with anchors. Base and pipeline interface Department inside the chamberpot special sealant. Outside white cement + white rubber cement slurry leveling. When buying a toilet is generally equipped with special sealant.
151, buy materials must first calculate the approximate amount. Buy water when thinking of doing a painting after anyway by figure what material much came out, and the little small trust a foreman, later found more bought 5 pipes, copper head actually spent 27, actually bought 40, should the remaining 13, actual remaining seven spans six. Repeatedly questioned by the foreman from other sites to get my "accidentally mixed elsewhere" 6 copper head. Circuit has its own detailed calculation of advance materials, the results of the calculation and requirements after comparing the foreman: wire from 30 meters to 12 meters, the network cable from the original 20 meters to 13 meters, other such as insulating blanket, plug has a very large difference is I corrected ...
152, ground if you have old down-flow pipe, in addition to go hit often corrupted, do not hesitate, laying of new, don't save, for safety reasons.
153, the bathroom wall of the inset object space don't waste placed, with good tile is very easy to use and very pretty. Of course Bush trade unions think trouble saying that "ugly", "now out," Oh, don't be fooled, he wants to be lazy.
154, tile Yang Kok don't lower edge lines, bricklayers mill 45-degree angle, you only beautiful mosaics, not to mention of course select the bricklayers lazy way to do things.
155, pipe installation sealing cement when must present to supervise the workers in accordance with the construction standards for hot water pipe expansion space reserved. In short the aluminum models don't seal the seed, loose some rather good.
156, toilet floor if high than Office, you can use the Mennonite stone transitional solution.
157, Canada pipe mobile sewer mouth, in the new pipeline and old sewer inlet connection before should check whether the old sewer, this time to spend money to avoid future dredging up a lot of trouble.
158, aluminium plates are not necessary to buy a high price, very cheap aluminum buckle is much better than PVC effect, then spend more money or do not see the effect of significantly different.
159, buy aluminum buckle paying particular attention to the joist instead of aluminium plates itself (aluminum buckle target is too big not easy checkers), keel tends to end the demons.
160, the color of the floor tiles are hard to find satisfactory, I did not find, but the two are not satisfied with the color staggered parquet then a 45 degree angle is able to reach me very satisfied with the results. This is bricklayers themselves to good advice.
161, ground waterproofing agent you want to use, I under the supervision of bricklayers not in accordance with requirements which are direct splashing on the ground, it can not uniform! it is best not to trouble yourself, but rest assured.
162, bathroom floor slope to shop before you consider good, brick, in accordance with the national standard of the slope is not able to achieve the rapid drainage of the effect, and if you used the odor leakage or slimline floor drain drainage will increase dramatically. Some say very nice gradient, I think it is nonsense. On the contrary larger slope can quickly run clean water is a very comfortable.
163, doors with LG Platinum point fire Board, the effect is good, but if you then consider the decoration may be finished door panel. Handmade doors is not delicate, is for informational purposes only.
164, sink large market famous brand price is not cheap, poor quality mad cow.
165, balcony door's fire Board not Variant. Balcony of environmental comparison difficult.
166, do toilet when surface basins Cabinet to consider good basin size does not fit, so in the future.
167, glass is very heavy stuff, best buy, or in the vicinity you should think which means of transport.
168, installation lock to lock tongue some wax, crashed onto wax is late. If there is no door suck so we need to pay attention to prevent hand wall and damaged.
P > 169, matte paint is better than highlights beautiful, don't listen to painters, if the painter said Matt bad brush that must be it technology. Similarly if the painter said there is no polyurethane with polyester is also a good lie to you of 170, insulation tape and sealing belt don't shop, buy, large supermarket quality is obviously much better, and component foot, converting down prices and not expensive.171, if you then will choose the product decoration PuTTY without talcum powder, no big reason is that the finished PuTTY. In particular, the painters after your own diy sacked when deep experience--talcum powder-PuTTY bored to death.
172, install Protector and air switch of junction of works not to province, but not to put indoor outdoor, thought province wages will just outside old junction, electrician recommendations on Indoor swap new, now found him this recommendation is of great value. Placed in the interior door is not ugly, it's easy to use!
173, direct find great decoration company site workers Pack clear workers maybe more appropriate and better technology, the tool compares the "Advanced".
174, protector and air switch to use the brand name. I used the "Merlin". Want to buy genuine goods also simple, direct telephone enquiries, Merlin Gerin, Headquarters telephone number, and then beat in the past asked local branch number.
175, the audience basin than bench pots pretty nice, clean, good.
176, basin mixer with the audience to pay attention, taking into account the thickness of the pelvic edge, leading to longer beak.
177, toilet installation, the hole is very large, large floor drain cover can fall, if you have already installed the toilet floor drain is not installed, please note the floor drain covers, or the floor drain cover away the custody or elsewhere.
178, buy silica gel, then imported the absolute best of GE, GE second Shanghai packaging. Of course, if used in a very important place in the 7, 8 $ can also be used, for example, aluminum window frames inside I used spam levels on the whole to the blocking of silica gel. However the bathroom kitchen completely selects GE silicone, value for money!
179, triangle valve should not be omitted, or you do not how much money, if any triangle valve, installation triangle valve can proactively identify copper joints have no leaks, if not installed, only the last installation mixer to copper connectors take over when to check was installed in the leakage due to leaking to pressure for a longer period of time to test it out, and finally install the inscribed and mixer, less security.
180, occasional journal in the already mentioned the decoration to do those things, their own can do, do, or want to use idea, decoration companies, communication with designers, construction team will communicate with workers, because of the realization of your idea, to rely on them.
181, decoration, the biggest problem lies in the communication!
182, not large, kitchen cabinets, designed for door-BH. L-type should be designed.
183, General decoration, decoration, excluding the formal management fees, taxes and fees, material costs account for 75-80 percent, wages accounted for 20-25 percent.
184, in the kitchen and bathroom on the ground outside, walk to the water pipe is a time bomb from home, who made it clear in when trouble for yourself.
185, if separated from wear, but in a tank, high-impact? effects can endure 186, consult a restaurant and a living room separated by what the most cost-effective package door sets, 6 cm on the side of the bag, or contaminated with white, height 2 m, you will not show much higher crude.
187, strong and weak current biography tube separately, cannot be separated from the best way to maintain the distance 10 cm above, but can be difficult, because most families to save money while having a bath. Audio cable into the power of the same pipe.
188, furniture inside can paint and plaster board, ready to open the door and after home ventilation, Windows and doors only to no odor. In fact you are using a good wood xinban, furniture inside can not handle.
189, 15% for Board Cabinet available and xinban, back available five clips, 5%. Package doors and tray child to 9%. Different
190, PPR pipe not only suitable for cold water pipes and hot water pipes and even pure drinking water pipes. PPR pipe interface using hot-melt technology, full integration between the pipes together, so once you install suppression test passes without leaking. And PPR pipe does not scale. PPR pipe is never scaling, never rusts, never leak, green, senior water materials.
191, paint plates, both solid wood and composite advantages.
192, don't put the wet print long on artificial stone, unless you want to dry a printing surface; do not put on the chopping block long wet surface. Wood wet sometimes fade; wire ball cleaning stains, like hand pimple.
193, the gas meter can use ordinary door seal in the cupboard? need to use the shutter-type door? periodically turn check ventilation.
194, Ching outworkers TX note, be sure to verify the renovation team to give you a list of materials. Their likely must estimate, I too believe them, bought almost wire and cable duct doubled.
195, Ware's size must be planned, it is best to draw the zoning plan in advance, calculate the size.
196, buy finished door the students notice that if you want to pursue effect with businesses supporting Panel Pack door sets, then you probably will have to be ruthless AZ a knife!
Re: 197, install water pipes before do you want to put the faucet and sink basin, have bought?
No, as long as they determine where the basin mixer, bathtub, washing machine, mixer or something on the line, 99 percent of the mixer and fell is in line with international norms, as long as workers not careless, nothing. If you own basin Cabinet basin bought in advance, or optimistic about size. Sink in front of computers, determine good size bought it before bed
Okay, don't forget that the audience or on the platform. Cold and hot water pipes in the space between letters using cement tiles must be accurate until 15 centimeters, and must be parallel. If you have bought, it is best to install it, and so after removing the seal.198, if you use a root 8 core line while taking telephone and network, will not interfere with each other?. 1, 2, 3, 6 hit the wire module, 4, 5 hit phone module, the other two casually said well I-experience: 10M 1236 100M were used to spent in fact 10/100M speed, we do not feel any difference if a 8pin line, some PBX signal will cause signal interference on the network, in the family environment is generally not a problem. Rest assured it can be routed separately but I recommend to leave some margin in the future, the network cable is very cheap for what you say?
199, be sure to carefully check the distribution box with installation.
200, mounted faucet lesson bath and shower faucet is connected to the pipe is embedded in the wall, I have repeatedly urged them to get access, not to hold. As a result of hot and cold water pipes spacing is left a 15 cm, hot and cold water pipes are not parallel, took water electric breast to install. I discovered yesterday that the Grohe Thermostatic faucet fb the coating has been cracked. If we can first mounted faucet, first install it. Should be bought the mixer, hot and cold water pipes, and then loaded tiles. Oujia mixer very early to buy back, is a chef who let buy oujia.
No comments:
Post a Comment